Monday, October 3, 2011

Day 29 10/3/2011

I was hoping to spend more time on the cabin today, but the day went by way to fast.  I did manage to put in some more insulation and pine boards though.
Note that the 2 x 4 walls were built in flush with the trailer wheel well.  The pine boards were able to go right over them and conceal them.
Getting around the plumbing seemed to go fine.  It will all be covered by the counter top and shelving underneath.  The panel will still need to be trimmed out.  I am thinking that I might built a small hinged door to cover it.

I only worked 4 hours today (198 total hours to date).

1 comment: